Skip to main content
News

Molonglo River bridge opens, knocking ten minutes off the Whitlam commute

The new four-lane crossing between Whitlam and the Tuggeranong Parkway is open, completing the missing link in the Molonglo Valley road network.

By The Brief18 June 20263 min read AI assisted
News: photograph by Annie HatuanhPhoto: Annie Hatuanh
News

Photo: Annie Hatuanh via Pexels.

The new Molonglo River crossing opened to general traffic at 6 am Saturday after a low-key ribbon cutting on Friday evening. This milestone marks the end of a significant construction phase for the region, providing a direct connection that locals have been anticipating since the first suburbs in the valley were established.

The 380-metre bridge completes the missing link between Whitlam and the Tuggeranong Parkway, removing a 14-kilometre detour via Cotter Road for residents heading south. By bridging this gap, the new infrastructure successfully integrates the Molonglo Valley road network with Canberra's broader arterial system.

For residents of Whitlam, the bridge represents a substantial change to daily routines. Until now, a trip to the southern districts required a lengthy loop, but the new four-lane alignment allows for a more direct and efficient commute, knocking approximately ten minutes off the journey.

Transport Canberra reroutes the 71 and 72 from Monday. These bus service adjustments will allow commuters to take advantage of the new river crossing immediately, streamlining public transport travel times between the Belconnen and Molonglo regions and reducing the reliance on older, indirect routes.

The bridge has been designed with an emphasis on capacity, featuring four lanes to ensure traffic flow remains consistent even as the surrounding suburbs continue to grow. The structural completion of the bridge signifies the final piece of the local road network puzzle for this part of the territory.

Active travel has also been a priority in the bridge design. A dedicated path on the southern side of the structure is now available for cyclists and pedestrians, providing a safe and scenic way to cross the river away from the main vehicle lanes.

While the bridge is open for use, some final touches are still being applied to the surrounding infrastructure. The active travel path on the southern side is sealed but not yet line-marked, so users are encouraged to take extra care while navigating the new surface.

The bridge serves as a vital corridor not just for cars, but for the expansion of cycling and walking networks in the Molonglo Valley. Once the final line-marking is completed, the path will offer a seamless connection for those opting for non-motorised transport between Whitlam and the Parkway.

A formal community day is scheduled for the last weekend of next month, with the road briefly closed for food trucks and a fun run. This event will offer locals a chance to walk the length of the bridge and celebrate the completion of the project before it becomes a permanent fixture of their daily drive.

Drivers are advised to familiarise themselves with the new intersection layouts and speed limits through the area as the bridge enters its first full week of operation. With the connection now live, the Molonglo Valley is more accessible than ever for residents and visitors alike.

Share

Have your say

Loading...

Loading comments...

Related stories

Free weekly events digest

Get the week's best events in your inbox.

One free email every Thursday with the best gigs, markets, food and family things to do in Canberra. No spam, unsubscribe anytime.

Free. Independent. No paywall, ever. We send a confirmation link before adding you.